Conflict Management In Construction Industry
This work examines conflict management in Nigeria construction industries, a case study of Julius Berger construction industry, FCT Abuja, Nigeria. The nature of conflict in the construction industry is so complex that if not properly managed can reduce productivity or escalate to litigation, this is due to varieties of people involved in it execution. Hence, Nigeria is not an exemption due to diverse religion, ethnicity and tribes which makes conflict inevitable in the Nigerian construction industry. Two research objectives, questions and hypotheses were formulated to guide this work. Descriptive/survey research design were adopted and Chi-square method were used to determine the hypotheses formulated, the sample size obtain were 82 management staff of Julius Berger, questionnaires were distributed to this management staff and collected. The study recommends that the Julius Berger construction industry, should create an enabling environment where employees can openly communicate and discuss issues affecting them. In doing so, management should try as much as possible to find out mutually acceptable solutions to problems and implement any joint decision taken by putting the organizational goals as well as employees’ interest into consideration.
Abstract
Chapter One
Introduction
1.1 Background of the study
1.2 Statement of the problem
1.3 Significance of the study
1.4 Objectives of the study
1.5 Research questions
1.6 Research hypotheses
1.7 Limitation of the study
1.8 Scope of the study
1.9 Definition of terms
Chapter Two
Literature Review
2.1 Conceptual Framework
2.2 Theoretical Framework
2.3 Empirical Review
Chapter Three
Research Methodology
3.1 Introduction
3.2 Research design
3.3 Research settings
3.4 Sources of Data
3.5 Population of the study
3.6 Sample size determination
3.7 Sample size technique
3.8 Instrumentation
3.9 Reliability
3.10 Validity
3.11 Method of Data Collection
Chapter Four
Data analysis and Interpretation
Chapter Five
Summary, Conclusion and Recommendation
5.1 Summary
5.2 Conclusion and Recommendation
Reference
The Title Page should be the first section of your project “Conflict Management In Construction Industry”, providing essential details like the project title, your name, your supervisor’s name, the institution, and the submission date. After that, the Abstract offers a brief summary of your project, touching on its purpose, methods, results, and conclusions in 150-300 words. The Acknowledgments section is where you can thank those who supported your research, such as your supervisor, peers, or organizations that provided resources.
Next, the Table of Contents organizes the Conflict Management In Construction Industry by listing its chapters and sections, along with page numbers for easy reference. The List of Figures and List of Tables help guide readers to specific visual elements like graphs, charts, or tables included in the document. There should also be an Abbreviations and Glossary section to explain any specialized terms or acronyms, making the content clearer to readers unfamiliar with the technical language.
The main body of the Conflict Management In Construction Industry should start with the Introduction, which provides background information, outlines the research problem, states your objectives, and gives a brief overview of your research methods. Following that, the Literature Review offers an in-depth look at previous research relevant to your project, identifying gaps your study aims to address. The Methodology section then explains the research design, tools, and data collection methods you used to conduct the project and analyze the data.
In the Results and Discussion section, you present your findings and discuss them in relation to the Conflict Management In Construction Industry research questions or objectives, often using tables or charts to help explain the data. The Conclusion summarizes the key results, discusses their implications, and suggests possible directions for future research. You may also include recommendations based on your findings, offering practical advice for improvements or applications. Finally, the Conflict Management In Construction Industry project should include a References or Bibliography section to list all the sources you cited, as well as Appendices for any additional material. A Statement of Originality is often included to confirm the authenticity of your work