Design And Implementation Of A Computer Based Quality Assurance Monitoring System
This study is based on the computerization of a quality assurance monitoring system of a manufacturing industry.
It entails sourcing from all parts of the company on how they operate especially in the quality assurance department.
This project is narrowed to the expected module. It is not the intention here to treat each module separately, hence the entire project is menu driven to cover some of the facilities present.
Finally, at the end of this work, we would have been able to get a computer-based system that assures quality of a product(s) of a manufacturing industry.
INTRODUCTION
1.1 BACKGROUND INFORMATION ON ANAMMCO
The Anambra Motor Manufacturing Company (ANAMMCO) is a joint venture between the federal government of Nigeria and Daimler Benz AG/ Mercedes Ag of Germany.
Mercedes Benz (MB) Anammco Limited was incorporated on 17th January 1977, and the new plant was commissioned on July 8th, 1980 by the First executive president of Nigeria, Alhaji Sheu Shagari. It started official production in 1981, and has to date made an enviable mark on the nation’s industrial growth, adding over 20,000 vehicles to the nations transport sector, backed up effectively with a network of over 36 after-sales service points and spare parts supply depots.
MB-ANAMMCO manufactures commercial vehicles and leads in the production of both private and commercial vehicles in Nigeria. This plant which occupies a sprawling 300,000 square meters site at Emene, near Enugu is virtually a shining example of a profitable and viable economic and technological co-operation between the government and people of Nigeria and Germany.
The multi-million-naira plant was initially planned to produce trucks for the Nigerian market. But today, the plant has diversified its production range to include the full range of commercial and private vehicles for the rapid industrialization of the country. It not only produces trucks as originally planned but has gone a step further in fabrication, manufacturing, and production of buses and other utility vehicles. Part of its product range today include; MB 0131, L 608 D, MB 1520, MB 230, MB 500 SEL, MB 1414, MB 911, MB 809, fire fighting vehicles, ambulances, mobile clinic collector and other various specialized types of vehicles. The company has expanded its bus programme to start producing a new intercity bus (MB 1635). It should also be noted that the MB-ANAMMCO has achieved over 657 local consent in some of these vehicles, especially in buses.
As a formidable representative of MB-A in Nigeria, MB-ANAMMCO brings mecedes-benz technology and know-how to Nigerians while at the same time create over 800 employment opportunity for Nigerians. Indeed, the establishment of MB-ANNAMMCO marked the realization of a great dream of developing the country technologically and industrially.
MB-ANNAMMCO has actively participated in the federal government assisted mass transit programme. It has supplied over 800 units of different bus models to the federal urban mass transit agency and state and local government mass transit programme. These buses are still strong and very capable as they are supported by the unbeatable after sale s services of the company and their renowned distributors and dealers. Only recently, the company was invited to produce 700 additional mass transit vehicles for the country to oushion the effect of the increase in the price of petroleum products.
Training facilities/opportunities centre were commissioned in April 26, 1982, sales, services and spare parts training for their staff and staff of their distributors, dealers and fliet owners.
MB-ANNAMMCO continues to live up to its social responsibilities in all ramifications. It takes care of its 800 employees by offering them medical services, recreational facilities, etc. In addition, it occasionally donates to charity organisations and identifies with the government in its socio-cultural endeavours and community development projects.
1.2 JUSTIFICATION OF THE PROJECT
Computerization or computer-based in this concept means the introduction of the computer to the different aspects and levels of the company. Rather than looking forward to handling information from, messenger – supervisor – maintenance- engineer- manager- expatiate manager –General manager – Board of Directors, this approach is necessary because computer is nearest to information systems. Not only that, it yields better results because a better information system normally improves organizational result.
So system must change. The purpose of this new trend is to outline orderly methods of design and effect the changes which is systematic in changing system. The system of modifying and reviewing them is called the system development cycle.
1.3 PURPOSE OF THE STUDY
The project accept different sources of spare parts, different models of vehicle and keeps track of them in files and can act any given time when needed by anybody generate the organisations report.
1.4 SCOPE OF STUDY
The scope of this study is mainly for the Anambra Motor Manufacturing Company (ANAMMCO) Nig. Ltd, Emene, Enugu state.
1.5 AIMS AND OBJECTIVES
The aims and objectives of this work is that when the system becomes operational, it will,
1. Permit on-line-time data storage and information retrieval.
2. Save the production time per section and as such ensure customer satisfaction.
3. Increase the operational efficiency and accuracy
1.6 LIMITATIONS
Various factors hindered the realization of the objectives of this work. Among these are:
1. Obtaining necessary information and approval from the production manager of the central spare parts department was not easy as most of his information required were regarded as company secrets.
2. This work is financially oriented as I am often forced to go to the private computer firms to run my programs because of the competition in the computer centre.
1.7 ASSUMPTIONS
It is assumed that after this work has been made, product(s) from the manufacturing company (ANNAMMCO) must have been assured to give customers the various information they need about any particular product(s).
1.8 DEFINITION OF TERMS
1. LEAD OR PROCUREMENT TIME: This is the period of time expressed in days, weeks, months etc between ordering and replenishment, he when goods are available for use.
2. Demand – This is the amount or quantity required by sales, production etc. per week, month or year etc.
3. Computerization: The introduction or the use of computer in a given work or study so as to enhance production.
4. Assurance: This is to express the certainty of range of product or products.
5. Economic ordering quantity (EOQ): This is the calculated ordering quantity which minimizes the balance of cost between inventory holding costs and reorder costs.
6. Reorder Quantity: This is the quantity of the replenishment order.
Cover page
Title page
Certification
Dedication
Acknowledgement
Abstract
Table of contents
CHAPTER ONE
1.0 Introduction
1.1 Background information on ANAMMCO
1.2 Justification of the project
1.3 Purpose of the study
1.4 Scope of study
1.5 Aims and objectives
CHAPTER TWO
2.1 Literature review
CHAPTER THREE
3.1 Description and analysis of the existing system
3.2 Fact finding methods
3.3 Organisation structure
3.4 Objectives of the existing system
3.5 Justification for the new system
CHAPTER FOUR
4.1 Design of the new system
4.2 Output specification and design
4.3 Input specification and design
4.4 File design
4.5 Procedure chart
4.6 System flowchart
4.7 System requirement
CHAPTER FIVE
5.1 Implementation
5.2 Program design
5.3 Program flowchart
5.4 Pesudocodes
5.5 Test run
CHAPTER SIX
6.1 Documentation
CHAPTER SEVEN
7.1 Recommendation
References
The Title Page should be the first section of your project “Design And Implementation Of A Computer Based Quality Assurance Monitoring System”, providing essential details like the project title, your name, your supervisor’s name, the institution, and the submission date. After that, the Abstract offers a brief summary of your project, touching on its purpose, methods, results, and conclusions in 150-300 words. The Acknowledgments section is where you can thank those who supported your research, such as your supervisor, peers, or organizations that provided resources.
Next, the Table of Contents organizes the Design And Implementation Of A Computer Based Quality Assurance Monitoring System by listing its chapters and sections, along with page numbers for easy reference. The List of Figures and List of Tables help guide readers to specific visual elements like graphs, charts, or tables included in the document. There should also be an Abbreviations and Glossary section to explain any specialized terms or acronyms, making the content clearer to readers unfamiliar with the technical language.
The main body of the Design And Implementation Of A Computer Based Quality Assurance Monitoring System should start with the Introduction, which provides background information, outlines the research problem, states your objectives, and gives a brief overview of your research methods. Following that, the Literature Review offers an in-depth look at previous research relevant to your project, identifying gaps your study aims to address. The Methodology section then explains the research design, tools, and data collection methods you used to conduct the project and analyze the data.
In the Results and Discussion section, you present your findings and discuss them in relation to the Design And Implementation Of A Computer Based Quality Assurance Monitoring System research questions or objectives, often using tables or charts to help explain the data. The Conclusion summarizes the key results, discusses their implications, and suggests possible directions for future research. You may also include recommendations based on your findings, offering practical advice for improvements or applications. Finally, the Design And Implementation Of A Computer Based Quality Assurance Monitoring System project should include a References or Bibliography section to list all the sources you cited, as well as Appendices for any additional material. A Statement of Originality is often included to confirm the authenticity of your work